Railway Vacuum Toilet System for Coach/Emu/Dmu/Lrt/Metro/Tram

Product Details
Customization: Available
After-sales Service: All Service Life
Warranty: 12 Months
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment methods: visa mastercard discover JCB diners club american express T/T
  Support payment in USD
Secure payments: Every payment you make at Made-in-china.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Trading Company
Secured Trading Service
Gold Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

  • Railway Vacuum Toilet System for Coach/Emu/Dmu/Lrt/Metro/Tram
  • Railway Vacuum Toilet System for Coach/Emu/Dmu/Lrt/Metro/Tram
  • Railway Vacuum Toilet System for Coach/Emu/Dmu/Lrt/Metro/Tram
  • Railway Vacuum Toilet System for Coach/Emu/Dmu/Lrt/Metro/Tram
  • Railway Vacuum Toilet System for Coach/Emu/Dmu/Lrt/Metro/Tram
  • Railway Vacuum Toilet System for Coach/Emu/Dmu/Lrt/Metro/Tram
Find Similar Products
  • Overview
  • Product Description
Overview

Basic Info.

Model NO.
Toilet system
Certification
ISO14001, ISO9001, IEEE/Uic/Iris/Crcc/Tb
Type
Toilet System
Voltage
24~380V
Collector
Vacuum Device
Standard
Uic/Iris/Crcc/Tb
Material of Valve
Stainless Steel
Transport Package
Wooden Box
Specification
Railway Standard
Trademark
East Railway
Origin
China
Production Capacity
10000 Pics/Year

Packaging & Delivery

Package Size
2500.00cm * 1000.00cm * 500.00cm
Package Gross Weight
500.000kg

Product Description

                   Railway Vacuum Toilet System for Coach/Emu/Dmu/Lrt/Metro/Tram        Railway Vacuum Toilet System for Coach/Emu/Dmu/Lrt/Metro/Tram
Product Description

https://eastrailway.en.made-in-china.com/company-Suzhou-East-Railway-Co-Ltd-.html

overview
The toilet system is used for receiving and storing the sewage generated by the toilet during the running of the railway passenger car.
Toilet System(septic collection system)
 1.Introduction
  1. Basic requirements:
    1. Withstand voltage fluctuation ability - GB/T 25119
    2. Insulation resistance and dielectric strength - GB/T 12817
    3. Electromagnetic compatibility - GB/T 24338.4
    4. Protection level - GB 4208
    5.  Noise and odor
      1. Noise
  1. Noise meets the requirements of different level of vehicles.
  2. If not specified, the following table requirements must be met, and there must be no weird squeaks:
Type General
Vacuum push-pull

Vacuum online
Value-dB 90 92 96
      1. Odor
  1.   There should be measures to prevent sewage from entering the car.
  2. The gas discharged from the vacuum system should be filtered.
    1. Reliability
1×104 h3×105,.
The average time between failures is not less than 1×104 h or the number of operations is not less than 3×105 times, whichever comes first.
    1. Maintainability
  1.  
  2. Ensure the maintenance space of the components, especially the underside of the squatting pan and the accessories on the sewage tank
  3.  
  4. There should be corresponding maintenance instructions and cycle plans.
    1. Security
  1. The power source, water source and compressed air source should be safe under all conditions.
  2. TB/T 3138(DIN 5510-2)
  3. Non-metallic materials and wires and cables comply with TB/T 3138 (DIN 5510-2)
  4. UIC 566EN 12663
  5. The load carrying capacity of the dirt box complies with UIC 566 or EN 12663
  6. If can directly see or touch the drain valve, need to add a warning sign to prevent the person from entering the injury

2.Function configuration table
No. 1 2 3 4 5 6 7 8 9
 
Water tank

Water supply system

Toilet system
-
Washbasin-Faucet

Control unit

Toilet bowl

Dirt collection system

Wastewater recycling
/
Antifreeze/Auto warning

Description

Optional capacity

Water flow rate

Gravity type

Inductive control

Intelligent automatic control

Seated

Optional capacity

Optional function

Optional function

Optional material

Backup pump

Vacuum type

Manual control
PLC
Squat

Optional material

Optional installation method

Optional heating function

Custom type
/
Ordinary single control

Custom type

Optional installation method


3.photos
Railway Vacuum Toilet System for Coach/Emu/Dmu/Lrt/Metro/Tram


4.About Us
      Railway Vacuum Toilet System for Coach/Emu/Dmu/Lrt/Metro/Tram Railway Vacuum Toilet System for Coach/Emu/Dmu/Lrt/Metro/Tram
 
  • Established in 2019, Suzhou East Railway Company was created to both supply and design components, complete passenger carriages, freight wagons and spare parts for the ever growing world railway market.
  • Our technical engineers, sales personnel and management team have many combined years of extensive experience in the Railway Industry with projects based all over the world.
  • Our goals is to meet all of the Customers' requirements, bringing them the best products, Project management, Maintenance, System Design and Integration at the best price possible without any problems or delays.
  • We offer a large inventory of products from the best Manufactures in China and other world leaders in railway product manufacture.
  • Global shipping and project requirements with time sensitive deliveries and savings is our main aim.
  • We look forward to help our clients grow and deliver in this industry all over the world.
5.Service
Railway Vacuum Toilet System for Coach/Emu/Dmu/Lrt/Metro/Tram
6.Contact Us

Railway Vacuum Toilet System for Coach/Emu/Dmu/Lrt/Metro/Tram


Railway Vacuum Toilet System for Coach/Emu/Dmu/Lrt/Metro/Tram



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier